Visual Registry

Project Portfolio

From corporate strategy to multi-megawatt installations. Documenting the infrastructure powering Kenya's green future.

The Core

Corporate & Stakeholder Operations

15 photos
Technical Team Briefing

Technical Team Briefing

Engineering team aligning on project deliverables

1 / 15

The Field

Engineering & Site Operations

22 photos
Control Panel Integration

Control Panel Integration

Inverter and monitoring setup

Rooftop Solar Mounting

Rooftop Solar Mounting

Structural assessment and rail installation

Panel Alignment Check

Panel Alignment Check

Precision tilt and azimuth calibration

PV System Installation

PV System Installation

Module-level wiring and connection

DC Electrical Wiring

DC Electrical Wiring

String configuration and cable management

Grid Connection Phase

Grid Connection Phase

Utility interconnection and synchronization

Component Integrity Test

Component Integrity Test

Thermal imaging and IV curve analysis

System Power Audit

System Power Audit

Output verification against design specs

Critical Infrastructure Setup

Critical Infrastructure Setup

Transformer and switchgear installation

Site Engineering Audit

Site Engineering Audit

On-site quality and safety inspection

Substation Compliance Test

Substation Compliance Test

Grid code compliance verification

Ground Array Installation

Ground Array Installation

Ground-mount structure assembly

Site Civil Works

Site Civil Works

Foundation and structural preparation

Equipment Logistics Plan

Equipment Logistics Plan

Transport and delivery coordination

Project Commissioning

Project Commissioning

Final testing and handover

Safety Protocol Review

Safety Protocol Review

OSHA and site safety briefing

Field Engineering Brief

Field Engineering Brief

Daily operations and task coordination

Industrial Solar Vista

Industrial Solar Vista

Completed rooftop installation overview

Waris Mall Project Site

Waris Mall Project Site

200kWp commercial deployment

Active Installation Hub

Active Installation Hub

Ongoing commissioning activities

Aerial Project Overview

Aerial Project Overview

Drone survey of installed array

System Monitoring Room

System Monitoring Room

IoT dashboard and performance tracking

Proof of Work

Unedited On-Site Documentation

17 photos
Proof of work
Proof of work
Proof of work
Proof of work
Proof of work
Proof of work
Proof of work
Proof of work
Proof of work
Proof of work
Proof of work
Proof of work
Proof of work
Proof of work
Proof of work
Proof of work
Proof of work

Want to see more of our active deployments?

We have a growing pipeline of industrial solar PPA projects across Kenya.

Partner With Us